HOME OPERATIONS TECHNOLOGY PORT SUSTAINABILITY COMMUNITIES CONTACT
ES|EN

Built to Perform.

Discover our operation

Decades of industrial discipline, turned into direct operational control. Results measured in barrels.

Aldyl Energía controls its operation end to end: in-house personnel, owned equipment and proprietary technology. That control took Morichal Pesado from 700 to 11,900 barrels per day in just over a year, with a concrete roadmap toward 80,583 BPD in 2027.

Aldyl in numbers

Current production

11,900 BPD

Investment in the field

USD 100M

Operations with in-house personnel

90%

Start of operations

1979

From 700 to 11,900 barrels per day in Morichal Pesado

In twelve months, production scaled 14x under Aldyl Energía's direct operation. The 2026-2027 plan charts the path to 80,583 barrels per day.

Our culture

Three Operational Pillars

Operational autonomy

Operational autonomy

90% of operations are executed with in-house personnel.

Owned equipment

Owned equipment

The company owns all of its operational equipment.

Tecnología e inteligencia artificial

Technology + AI

Real-time monitoring and contingency correction with artificial intelligence.

USD 20M in new operational capacity

In July 2026, four Drillmec rigs arrived in Guanta: two Workover units (W101, W102) and two Drilling Rig units (H102, H108), from Argentina, Brazil and Uruguay. Three additional H200 drilling rigs join in September.

Drillmec drilling rig Rig in operation
Barriles platform: field, control room and mobile app

Barriles: real-time operational control

Barriles is the operational intelligence platform developed by Aldyl Energía: it monitors production in real time, ensures full traceability, and uses artificial intelligence to correct contingencies the moment they occur.

Barriles on laptop and phone

Operational plan 2026-2027

476 reactivations and 79 drilling operations planned for 2026-2027: 555 wells in total.

Presence: Venezuela, Colombia, Peru, Chile, Brazil, Uruguay, Argentina, Italy and India
ACTIVITYPLAN 2026PLAN 2027TOTAL 2026-2027
Compression wells68--68
Well services332962
Well rehabilitation30316346
Well drilling47579
TOTAL135420555

Sustainability

Safety

Safety

People's safety is a condition of the operation, not an add-on.

Health

Health

Occupational health at every stage of the operation.

Environment

Environment

Zero routine gas flaring by 2030.

Capital allocation thesis

Aldyl applies a consistent capital allocation thesis: identify underutilized assets and operational capabilities, professionalize their operation under direct control, and scale them with financial discipline. It is the same rationale behind two concrete capital decisions —the restructuring of Aldyl as an integrated oilfield services platform, and the acquisition of Petreven in February 2026— that today underpin the company's execution capacity in Morichal Pesado.